CVRDA Photo Gallery

CVRDA images


Most viewed - Restorations
016.JPG
290 viewsCockpit sole painted with 3 coats Blakes non slip deck paint, and ready to start thinking about bolting and screwing things down. This where we’re at as of the beginning of December 2013, only 5 years into the project!
cyan_1.jpg
Cyanoacrylate286 views
013.jpg
270 viewsClamping up the port side cockpit coaming. Yes I know – not enough of them
006.JPG
267 viewsSibrwd ensconsed, ready to start
001.jpg
266 viewsHow we found the boat. Looks ok. She wasn’t.
007.png
265 viewsCockpit sole going in 6mm ply epoxy sealed on 2”x1” Douglas Fir stringers on 9mm ply floors/ bulkheads. 2” x 1” DF inner and outer whales glued down and through screwed from the inside. The fibre glass bulkhead was the only internal structure, other than the centreplate box to survive the takedown.
005.JPG
259 viewsThe garage
002.jpg
258 viewsThe boat all set to travel back to Wales. Just need to strap it down, and find somewhere to put 30’ of mast.
004.JPG
253 viewsSibrwd gutted
     
45 files on 4 page(s) 4