|
|

349 viewsHow we found the boat. Looks ok. She wasn’t.
|
|

327 viewsThe boat all set to travel back to Wales. Just need to strap it down, and find somewhere to put 30’ of mast.
|
|

348 viewsSibrwd gutted
|
|

387 viewsArgh! Mulch and rot aplenty
|
|

337 viewsThe garage
|
|

342 viewsSibrwd ensconsed, ready to start
|
|

355 viewsCockpit sole going in 6mm ply epoxy sealed on 2â€x1†Douglas Fir stringers on 9mm ply floors/ bulkheads. 2†x 1†DF inner and outer whales glued down and through screwed from the inside. The fibre glass bulkhead was the only internal structure, other than the centreplate box to survive the takedown.
|
|

407 views‘space frame’ to carry the loads from the unstayed mast and support the foredeck
|
|

371 viewsAnother shot of the foredeck/mast support arrangement. The plastic tube was a trial fit to make sure I got the rake right. I did toy with glassing it to produce a cone, but went for a wooden box section instead
|
|

390 viewsSurprise’s rig. Sibrwd’s will be pretty much identical.
|
|

382 viewscockpit coaming offered up prior to screw and glue. I know - not enough clamps! I put on a load more after this photo was taken.
|
|

402 viewsThe mast socket, up in the eyes of the boat.
|
|
|
|